Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing

Reconstruction 002: Electric August 23/24, 2004


August 23, Planning and Layout

August 24, Running the Lines

A counter-top outlet.

Next, for the Refrigerator

Counter Outlets

The First of the Can Lights

The new sub-panel in the electrical closet


Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing