Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing

Reconstruction 003: Electric and Plumbing, August 25, 2004


The new plumbing is in place.

And the old plumbing is on the way to the dump.

Most of the can lights are up.

The wiring is all in.


Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing