Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing

Time-Out, Sept. 11 - 16
(waiting on the floor installation on the 16th)

kitchen coming along

appliances have arrived.

sliding shelves in a cabinet.

drawers that open fully.

more sliding shelves.

trying out a 42 inch table

At Bat
(work picnic, first time cricket player)

chatting with the umpire

it's a hit


Pics (2003) Plans Layouts Soffit Holes Cabinetry Demo Prep Demo 001
Demo 002 Demo 003 Demo 004 Floor Joists Electrical Plumbing Sub-floor
Walls Lights Sills Primer Cabinet-1 Cabinet-2 Time-Out
Floor Install Fridge / Stove Final Cabinet Counters Then / Now Credits Finishing